Categories: World News

Just Askin’ | Will there be road work around Louisville’s new VA hospital?

Spread the love


The new VA medical center’s towering presence draws glances from drivers passing through northeast Louisville and is bound to grow even more as construction work on the 34-acre site along Brownsboro Road and Interstate 264 is not quite done.

Advertisements

In preparation for the opening of the massive campus, officials with the city and state are working to handle an expected increase in energy usage and vehicle traffic. Here are a few things to know about the hospital and other nearby projects.

When will the new VA hospital open?

A rendering of a proposed VA hospital to be built in Louisville on Brownsboro Road.

Construction of the Louisville VA Medical Center is scheduled to be complete in “early 2026”, according to the U.S. Department of Veterans Affairs. Officials hosted a groundbreaking ceremony at the site on Nov. 11, 2021, The Courier Journal previously reported.

Advertisements
Advertisements

On Monday, crews began work on installing utilities, constructing part of a parking structure and setting the foundation for a water tower, according to a construction update posted online by the VA. Crews will continue this work and complete other tasks over a two-week period.

Advertisements

More about the new VA hospital: What’s that big building under construction on Brownsboro Road? Here’s what to know

Are they changing the roads around the new VA hospital in Louisville?

Yes. The Kentucky Transportation Cabinet is leading an effort to widen the Watterson Expressway from two to three lanes at Brownsboro Road and improve traffic flow on I-264 between the Westport Road and Interstate 71 interchanges, among other projects.

Construction work at I-264 and Brownsboro Road could begin in 2025, but an exact starting date has not determined due to an ongoing effort by LG&E to reposition utility poles and wires sitting where a new roadway would be. LG&E anticipates to have all of the poles relocated by January 2025, according to project documents.

Advertisements

Plans are also in the works to build a new electric substation, which will be built along Brownsboro Road near northbound I-71. Officials said the substation is expected to be completed by October.

In a statement on its website, LG&E acknowledged the VA hospital as a “major factor” for building a new substation, but the company it was not the only reason for it.

“The hospital — and its expected energy needs — must be factored into our long-term plans for the area,” officials said. “This portion of Jefferson County is rapidly growing, with new developments on the horizon. The new substation and circuit investments are necessary to support this growth and to further reinforce our system to ensure we continue providing safe, reliable power for years to come.”

More: How to stay safe during the latest Louisville summer heat wave

Will there be parking at the new VA hospital in Louisville?

A larger hospital does mean more parking. The VA said there would be 2,600 parking spaces at the new site, about 1,000 more than the existing Robley Rex Medical Center.

Reporter Lucas Aulbach contributed. Reach reporter Leo Bertucci at lbertucci@gannett.com or @leober2chee on X, formerly known as Twitter

This article originally appeared on Louisville Courier Journal: New Louisville VA Hospital: Details on opening date, road construction

Advertisements



Source link

Advertisements
Leo Bertucci, Louisville Courier Journal

Recent Posts

Hurricane Beryl Intensifies to a Category 4 Storm

Beryl developed into a record-breaking Category 4 hurricane on Sunday — the earliest in a…

4 mins ago

‘Extremely Dangerous’ Hurricane Beryl Breaks Record as Season Begins : ScienceAlert

Hurricane Beryl plowed toward the southeast Caribbean on Sunday as residents were urged to hurry…

10 mins ago

We Are Honor Bound To Commandeer Mark Zuckerberg’s Megayacht

Sometime in the middle of the night on June 21, a man quietly walked the…

24 mins ago

Grab the realme GT 6 for P29,999 and Receive a FREE Globe Prepaid 5G SIM for a Limited Time

The all-new realme GT 6 is now available in Shopee and TikTok at an introductory…

27 mins ago

North Korea fires ballistic missile as tensions with South Korea soar | World | News

North Korea has reportedly launched a ballistic missile toward its eastern waters as tensions continue…

56 mins ago

Facemasks anew at NAIA

Authorities at the Ninoy Aquino International Airport (NAIA) have again imposed face masks on travelers…

1 hour ago

This website uses cookies.