Categories: Science & Technology

NASA’s Artemis Engine Test Blazes a Trail to the Moon and Beyond

Spread the love


NASA completed a full-duration, 500-second hot fire of an RS-25 certification engine on January 17, continuing a critical test series to support future SLS (Space Launch System) missions to the Moon and beyond as NASA explores the secrets of the universe for the benefit of all. Credit: NASA/Danny Nowlin

Advertisements

NASA advances Artemis missions with a successful RS-25 engine test, aiming to certify engines for the SLS rocket’s future lunar explorations, beginning with Artemis V.

NASA continued a critical test series for future flights of NASA’s SLS (Space Launch System) rocket in support of the Artemis campaign on January 17 with a full-duration hot fire of the RS-25 engine on the Fred Haise Test Stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi.

Advertisements
Advertisements

Data collected from the test series will be used to certify production of new RS-25 engines by lead contractor Aerojet Rocketdyne, an L3Harris Technologies company, to help power the SLS rocket on future Artemis missions to the Moon and beyond, beginning with Artemis V.

NASA’s test on January 17 at the Stennis Space Center marked a significant step in the Artemis program, successfully conducting a full-duration hot fire of the RS-25 engine. Credit: NASA/Danny Nowlin

Advertisements

Teams are evaluating the performance of several new engine components, including a nozzle, hydraulic actuators, flex ducts, and turbopumps. The current series is the second and final series to certify production of the upgraded engines. NASA completed an initial 12-test certification series with the upgraded components in June 2023.

During the January 17 test, operators followed a “test like you fly” approach, firing the engine for the same amount of time – almost eight-and-a-half minutes (500 seconds) – needed to launch SLS and at power levels ranging between 80% to 113%.

In a pivotal engine test for the Artemis missions, NASA executed a full-duration hot fire of the RS-25 on January 17. Credit: NASA/Danny Nowlin

Advertisements

The January 17 test comes three months after the current series began in October. During three tests last fall, operators fired the engine for durations from 500 to 650 seconds. The longest planned test of the series occurred on November 29 when crews gimbaled, or steered, the engine during an almost 11-minute (650 seconds) hot fire. The gimbaling technique is used to control and stabilize SLS as it reaches orbit.

Each SLS flight is powered by four RS-25 engines, firing simultaneously during launch and ascent to generate over 2 million pounds of thrust.

NASA’s recent RS-25 engine test signifies a leap towards lunar exploration through the Artemis program. By testing new engine components at the Fred Haise Test Stand, NASA moves closer to the Moon, with the successful test reinforcing the SLS rocket’s capability for Artemis V. Credit: NASA/Danny Nowlin

Advertisements

The first four Artemis missions with SLS are using modified space shuttle main engines that can power up to 109% of their rated level. The newly produced RS-25 engines will power up to the 111% level to provide additional thrust. Testing to the 113% power level provides an added margin of operational safety.

With the completion of the test campaign in 2024, all systems are expected to be “go” for production of 24 new RS-25 engines for missions beginning with Artemis V.

Through Artemis, NASA will establish a long-term presence at the Moon for scientific exploration with commercial and international partners, learn how to live and work away from home, and prepare for future human exploration of Mars.





Source link

Advertisements
NASA Stennis Space Center

Share
Published by
NASA Stennis Space Center

Recent Posts

How Gaza anger hit Labour vote share: John Ashworth unseated, Jess Phillips’ narrow survival as Corbyn beats the party he once led

Sign up for the View from Westminster email for expert analysis straight to your inboxGet…

22 mins ago

5,000 domestic helpers in demand

CLOSE to 5,000 jobs as domestic helpers are up for the grabs due to high…

32 mins ago

Indiana becoming home to duck with ‘harlot-like face’ and ‘lipstick-colored bill’

In 2017, the first black-bellied whistling ducks were reported in Vanderburgh County, Indiana.The following year,…

36 mins ago

Trump Advisers Call for U.S. Nuclear Weapons Testing if He Is Elected

Allies of Donald J. Trump are proposing that the United States restart the testing of…

38 mins ago

Distracting preschoolers with devices could cause trouble down the road, study suggests

Parents who steal a moment of calm by handing over a smartphone or tablet to…

48 mins ago

Buddy Hield traded to Warriors from 76ers

FILE – Philadelphia 76ers guard Buddy Hield (17) drives past Los Angeles Clippers guard James…

54 mins ago

This website uses cookies.