Committee on Energy (January 10, 2024)

Spread the love



Agenda: P.S. Res. No. 46 – Operations of the National Grid Corporation of the Philippines (By: Sen. Gatchalian)

Advertisements

P.S. Res. No. 47 – Plans of the Department of Energy to Provide Long Term Solutions to Power Supply Shortages (By: Sen. Gatchalian)

P.S. Res. No. 49 – National Strategy of DOE to Ensure the Country’s Energy Security and Self-Sufficiency (By: Sen. Gatchalian)

P.S. Res. No. 556 – Continuous Supply of Electricity (By: Sen. Villanueva)

Advertisements
Advertisements
Advertisements
Advertisements

P.S. Res. No. 579 – Panay Island Electric Power Situation (By: Sen. Poe)

Advertisements

P.S. Res. No. 607 – Successive Electric Transmission System Disturbances (By: Sen. Gatchalian)

P.S. Res. No. 609 – Power Outages Due to Lapses in the Transmission System (By: Sen. Tulfo)

Motu proprio investigation on the widespread power outage in Panay Island which occurred on January 2, 2024 to identify the cause of power failure and implement urgent and effective solutions, and a comprehensive plan of action to resolve the same

source

Advertisements

Please Login to Comment.

Verified by MonsterInsights